Projects
Rediscover Veterans Memorial Bridge Input
The 2023 Summary of Community Input is a report on the public feedback the Cleveland Urban Design Collaborative collected at the Rediscover Veterans Memorial Bridge events in June 2023. The report references the 10-year old Detroit-Superior Bridge Connectivity Plan and focuses on connections to new developments underway nearby.
Read the Public InputStructural Evaluation Report
The 2014 Structural Evaluation Report provided a structural evaluation and planning level cost estimates for a shared bicycle and pedestrian path on the lower level of the bridge. This investigation was part of the Detroit-Superior Bridge Project Connectivity plan.
Read the ReportDetroit-Superior Bridge Connectivity Plan
The 2013 Detroit-Superior Bridge Connectivity Plan, funded by the Northeast Ohio Areawide Coordinating Agency's Transportation for Livable Communities Initiative (TLCI) program, developed a vision for activating the lower deck of the Veterans Memorial Bridge.
Read the Plan